Field Development Plan — Daniel Boone

Generated by the worldenergydata field-development playbook (epic #567). Recommendation is heuristic (Concept Select / FEL-1 fidelity), not a sanctioned design.

Engineering rationale

The engine's top recommendation (Subsea Tieback) matches the concept actually built (Subsea Tieback). The recommendation is produced on a blind probe — the as-built concept is stripped before scoring — so the agreement reflects the depth, basin and host-proximity signal, not the answer.

Field parameters

Water depth
1311.0 m
Concept
subsea_tieback
Fluid
oil
Operator
Murphy
Wells
1
Plateau
Tieback
First oil

Recommended concept shortlist

ConceptScoreTreesRationale / flags
subsea_tieback ★0.874wettypical of gom development practice; host within 60 km with spare capacity
semisub_fps0.787wettypical of gom development practice
tlp0.783drytypical of gom development practice
spar0.771drytypical of gom development practice
subsea_to_shore0.688wet

★ = the concept actually selected for this field (where known).

Economics & execution (engine estimate)

Dev system
subsea15
Est. CAPEX
308.0 $MM
Est. NPV
Install vessels
11
Max crane
5000.0 t
Hardware
RJ-08-HYD-15K

As built (actuals)

Block
Green Canyon 646
BSEE code
GC646
Operator
Murphy
Concept (as built)
Subsea Tieback
Engine top pick
Subsea Tieback
Match
✓ match

Architecture & layout (subsea_tieback)

Subsea architecture — Daniel Boone flowline umbilical jumper control export Export Existing Host (tieback) Manifold 1 XT 1
Subsea architecture block diagram
Field layout — Daniel Boone Subsea manifold Manifold 1 Subsea tree (wet XT) XT 1 Existing host (tieback) Existing Host (tieback) Export Export N 1 km
Plan-view field layout (to scale)

Sources: SubseaIQ field catalog (~2014) + BSEE + curated vessel/ subsea catalogs. Schematics are deterministic, generated from the field concept.